Document Feedback - Review and Comment
Step 1 of 4: Comment on Document
How to make a comment?
1. Use this to open a comment box for your chosen Section, Part, Heading or clause.
2. Type your feedback into the comments box and then click "save comment" button located in the lower-right of the comment box.
3. Do not open more than one comment box at the same time.
4. When you have finished making comments proceed to the next stage by clicking on the "Continue to Step 2" button at the very bottom of this page.
Important Information
During the comment process you are connected to a database. Like internet banking, the session that connects you to the database may time-out due to inactivity. If you do not have JavaScript running you will recieve a message to advise you of the length of time before the time-out. If you have JavaScript enabled, the time-out is lengthy and should not cause difficulty, however you should note the following tips to avoid losing your comments or corrupting your entries:
-
DO NOT jump between web pages/applications while logging comments.
-
DO NOT log comments for more than one document at a time. Complete and submit all comments for one document before commenting on another.
-
DO NOT leave your submission half way through. If you need to take a break, submit your current set of comments. The system will email you a copy of your comments so you can identify where you were up to and add to them later.
-
DO NOT exit from the interface until you have completed all three stages of the submission process.
(1) This procedure outlines the structures and processes in place at Charles Sturt University (the University) for the management of emergencies where an immediate internal or external emergency services response is required. This procedure supports compliance with: (2) This procedure is applicable to all University premises and is based on Australian legislation. As such, amendments to meet local country legislative requirements to accommodate offshore sites will be allowed for. (3) Where an emergency occurs on University premises, this procedure is the first process under the Resilience framework that should be enacted: (4) This procedure supports the Resilience Policy. (5) An emergency planning committee (EPC) provides the forum for consultation, hazard identification and review of emergency planning arrangements and procedures. The Work Health and Safety Committee currently operates as the EPC. (6) In accordance with Delegation Schedule D - Facilities and Information Technology, the Chief Operating Officer has been granted authority by the University Council to: (7) The EPC and the Chief Wardens, on behalf of the Chief Operating Officer, will establish emergency control organisations (ECO) to direct and control the implementation of a facility’s emergency response procedures and monitor the efficient functioning of these bodies and the oversight of emergency management within the University. (8) Managers and supervisors will ensure that all staff and others under their control are covered by a current and practised site emergency plan and that all staff cooperate and support the EPC and ECOs. This may include, but is not limited to: (9) The ECO is responsible for managing the initial response to an emergency, particularly evacuations if required or administration of first aid, until other support arrives. This includes the University security personnel and external emergency services. (10) The Manager, Health Safety and Wellbeing shall provide the EPC with ECO status reports on a regular basis. (11) The emergency planning committee (EPC) is responsible for developing, implementing and monitoring emergency preparedness for the University. (12) Responsibilities include: (13) See Section 4 of this procedure. (14) During an emergency or emergency exercise, emergency control organisations (ECO) personnel have absolute authority to issue instructions to evacuate and direct all persons. (15) The University will indemnify emergency control personnel for their reasonable actions, taken in good faith and in accordance with their training. (16) Refusal to comply with the reasonable directions of ECO personnel in the conduct of their duties, during emergencies or emergency exercises, may be considered misconduct and deemed to be in breach of the Code of Conduct (for staff) and/or the Student Charter and Student Misconduct Rule 2020 (for students). (17) All managers and supervisors shall ensure that information, instruction and training is provided as below (based on the requirements of AS3745-2010 Planning for emergencies in facilities). (18) Emergency procedures and the actions required by all staff, contractors and visitors shall be included in induction training. (19) Staff knowledge will be refreshed at least annually through participation in emergency trials. (20) Work Health and Safety Committee members will be provided information and instruction in relation to their responsibilities as the EPC. (21) ECO personnel (including wardens and security personnel) will be trained to develop and maintain the skills and knowledge necessary to undertake the duties set out in the site emergency response procedures. (22) Refresher training for ECO personnel will be completed every two years. (23) All first aiders will be trained as per the nationally recognised unit of competency. (24) First aid training will be refreshed every three years, with CPR training refreshed annually. (25) Records related to emergency management must be retained in accordance with the NSW State Records general disposal authorities (GA 28 Administrative records) unless longer retention is required under other regulatory requirements. This includes: (26) Records management will be in accordance with the Records Management Procedure. (27) All sites/business areas must identify persons with roles and responsibilities regarding this procedure and communicate requirements. Persons may hold more than one role. (28) For the purpose of this procedure:Emergency Management Procedure
Section 1 - Purpose
Scope
Top of PageSection 2 - Policy
Section 3 - Procedure
Part A - Emergency management planning and governance
Emergency planning committee
Roles and responsibilities
Part B - Authority in emergencies
Authority of ECO personnel
Failure to comply
Part C - Information, instruction and training
Induction
Emergency planning committee (EPC) members
Emergency control organisation (ECO) members
First aiders
Record retention
Section 4 - Guidelines
Appendix A – Roles and responsibilities
Top of Page
R
A
C
Consulted
Person or persons that need to be consulted as part of completing the task
I
Informed
Person(s) that need to be informed
Section 5 - Glossary