How to make a comment?
1. Use this to open a comment box for your chosen Section, Part, Heading or clause.
2. Type your feedback into the comments box and then click "save comment" button located in the lower-right of the comment box.
3. Do not open more than one comment box at the same time.
4. When you have finished making comments proceed to the next stage by clicking on the "Continue to Step 2" button at the very bottom of this page.
Important Information
During the comment process you are connected to a database. Like internet banking, the session that connects you to the database may time-out due to inactivity. If you do not have JavaScript running you will recieve a message to advise you of the length of time before the time-out. If you have JavaScript enabled, the time-out is lengthy and should not cause difficulty, however you should note the following tips to avoid losing your comments or corrupting your entries:
-
DO NOT jump between web pages/applications while logging comments.
-
DO NOT log comments for more than one document at a time. Complete and submit all comments for one document before commenting on another.
-
DO NOT leave your submission half way through. If you need to take a break, submit your current set of comments. The system will email you a copy of your comments so you can identify where you were up to and add to them later.
-
DO NOT exit from the interface until you have completed all three stages of the submission process.
(1) This guideline supports the Facilities and Premises Policy and Facilities and Premises Procedure - Access, Use and Security, by describing how to: (2) Refer to the Facilities and Premises Policy. (3) This guideline supports the Facilities and Premises Policy. (4) This guideline supports the Facilities and Premises Procedure - Access, Use and Security. (5) Report the loss or damage to Campus Security. (6) If the organisational unit or area has an incident response plan, this should be carried out. Alternatively, Campus Security or the Campus Facilities Manager or their nominee will advise how to proceed. (7) Where a response or recovery plan is in place, this should be carried out once the scene has been stabilised. See the Resilience Policy for more information. (8) If no response or recovery plan is in place, the following process may be followed: (9) Information about the loss or damage should be captured in a central register. This information must include a description of the damaged item, approximate cost to rectify the damage, relevant org/account codes, model, serial number, year of manufacture and photographic evidence. (10) As stated in the Facilities and Premises Procedure - Access, Use and Security, loss or damage exceeding $10,000 must be reported to the University’s Financial Accountant (Insurance) who will provide advice on insurance claims and the appointment of a loss adjustor if necessary. Loss or damage under $10,000 must be borne by the organisational unit. Loss or damage exceeding the retention amount (currently $30,000 – this may vary) may be claimable under the University’s property protection policy. (11) After all damage has been costed, the incident controller will forward the completed register and all invoices associated with the works to the Financial Accountant (Insurance), Division of Finance for processing. (12) Affected organisational units are responsible for ensuring their business continuity plans are implemented and resuming normal operations and activities as soon as possible. This includes: (13) Replacing damaged office equipment, computers and AV equipment is the responsibility of the affected organisational unit, in conjunction with the insurance loss adjustor (if one is engaged). (14) All replacement or repair costs must be recorded on the incident controller's register. (15) All new equipment must be procured in accordance with the Finance Procedure - Procurement. (16) Building, structural or plant repair must be carried out or coordinated by FM, including engaging expert advice in relation to structural or plant damage. (17) Repairs, replacements or making safe any affected data and communication infrastructure must be carried out or coordinated by DIT, including inspection and testing of wiring and related equipment integrity. (18) For the purposes of this guideline:Facilities and Premises Guidelines - Damage or Loss of Property
Section 1 - Purpose
Scope
Top of PageSection 2 - Policy
Section 3 - Procedures
Section 4 - Guidelines
Initial response
Response and recovery
Replacing equipment and repairs
Section 5 - Glossary